VA Lenders Handbook (VA Pamphlet 26-7), Chapter 10, Topic 14 — Construction Inspections
VA Lenders Handbook (VA Pamphlet 26-7), Chapter 10, Topic 14 — Construction Inspections.
Verbatim regulatory text
Verbatim provisions from VA Lenders Handbook (VA Pamphlet 26-7), Chapter 10, Topic 14 — Construction Inspections — each quote is a verified substring of the regulator-published source snapshot, not retyped. Quoted for reference; this is not legal advice. The operational layer (P&P updates, prompts) lives in the regulation update kits.
VA Lenders Handbook (VA Pamphlet 26-7), Chapter 10, Topic 14 — Construction Inspections
14. Construction Inspections Change Date March 11, 2019 • This chapter has been revised in its entirety. a. Local Building Inspections Many local building authorities have adopted comprehensive residential building codes and perform mandatory inspections at the foundation, framing, and final stages of construction. b. Confirming Local Inspections Performed On cases involving new or proposed construction, lenders must confirm whether or not local inspections are performed. c. Purpose of Inspections The purpose of the inspections is to ensure that the property: • is built according to the building codes adopted by the local authority, and • has been satisfactorily completed as evidenced by a final construction inspection or certificate of occupancy. d. Missed Inspections In the event that the local authority provides construction inspections, but none were conducted, the property is ineligible to be the security for a VA-guaranteed loan. VA Pamphlet 26-7, Revised Chapter 10: Appraisal Process 10-26
Operationalizing VA Lenders Handbook (VA Pamphlet 26-7), Chapter 10, Topic 14 — Construction Inspections
This is verbatim, source-snapshotted regulator text from the Claude for Compliance open corpus. To turn a rule like this into compliance work product: gap-analyze your policies and procedures (P&Ps) against these requirements to surface stale, conflicting, or missing provisions; operationalize any change with a ready-to-run update kit; and produce audit-ready evidence — every step grounded only in the regulator’s own words, never invented.
Source of record: https://claudeforcompliance.com/regs/va-m26-7-ch10-t14/
· register va-m26-7-ch10-t14 · Claude for Compliance. Free to read and download;
see regulatory updates and methodology.