VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 17 — Individual Sewage Disposal

va-m26-7-ch12-t17

VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 17 — Individual Sewage Disposal.

Get this register: .xlsx .csv Full text PDF More bundles →

Verbatim regulatory text (1)

Verbatim provisions from VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 17 — Individual Sewage Disposal — each quote is a verified substring of the regulator-published source snapshot, not retyped. Quoted for reference; this is not legal advice. The operational layer (P&P updates, prompts) lives in the regulation update kits.

VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 17 — Individual Sewage Disposal

17. Individual Sewage Disposal Change Date March 28, 2019 • This chapter has been revised in its entirety. a. Individual Sewage Disposal An individual sewage disposal system must adequately dispose of all domestic wastes in a sanitary manner which will not create a nuisance, or in any way endanger the public health. b. Pit Privies Individual pit privies are acceptable where such facilities are customary and installed in accordance with the recommendations of the local health authority. c. Health Authority Approval On proposed construction cases, or new or existing construction cases where the appraiser notes a problem, or if the area is known to have soil percolation problems, health authority approval of the individual sewage disposal system is required. d. Connection Mandated by a Local Authority If public sewer is available and the local authority mandates connection, connection is required (see Topic 16 of this Chapter). VA Pamphlet 26-7, Revised Chapter 12: Minimum Property Requirements 12-25

Source: VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 17 — Individual Sewage Disposal · source URL · snapshot 824171a914866a59

Operationalizing VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 17 — Individual Sewage Disposal

This is verbatim, source-snapshotted regulator text from the Claude for Compliance open corpus. To turn a rule like this into compliance work product: gap-analyze your policies and procedures (P&Ps) against these requirements to surface stale, conflicting, or missing provisions; operationalize any change with a ready-to-run update kit; and produce audit-ready evidence — every step grounded only in the regulator’s own words, never invented.

Source of record: https://claudeforcompliance.com/regs/va-m26-7-ch12-t17/ · register va-m26-7-ch12-t17 · Claude for Compliance. Free to read and download; see regulatory updates and methodology.