VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 34 — Radon Gas

va-m26-7-ch12-t34

VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 34 — Radon Gas.

Get this register: .xlsx .csv Full text PDF More bundles →

Verbatim regulatory text (1)

Verbatim provisions from VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 34 — Radon Gas — each quote is a verified substring of the regulator-published source snapshot, not retyped. Quoted for reference; this is not legal advice. The operational layer (P&P updates, prompts) lives in the regulation update kits.

VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 34 — Radon Gas

34. Radon Gas Change Date October 18, 2019 • This chapter has been revised in its entirety. a. Testing Recommended by VA On the NOV that is provided to Veterans with the results of the appraisal, VA recommends testing for radon gas. b. Builder Certification On proposed and new construction cases, the builder must certify that radon resistant construction techniques were used where applicable and construction meets any local or state building codes for radon control. Radon resistant construction techniques are considered to be applicable for properties located in Radon Zone 1 as designated by the EPA at the following website: https://geopub.epa.gov/Radon/. Additional information about radon resistant construction techniques is available at the following link: https://www.epa.gov/radon/radon-resistant-construction-basics-and- techniques. c. Additional Information Additional information about radon gas is available at the following link: https://www.epa.gov/radon. VA Pamphlet 26-7, Revised Chapter 12: Minimum Property Requirements 12-43

Source: VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 34 — Radon Gas · source URL · snapshot 824171a914866a59

Operationalizing VA Lenders Handbook (VA Pamphlet 26-7), Chapter 12, Topic 34 — Radon Gas

This is verbatim, source-snapshotted regulator text from the Claude for Compliance open corpus. To turn a rule like this into compliance work product: gap-analyze your policies and procedures (P&Ps) against these requirements to surface stale, conflicting, or missing provisions; operationalize any change with a ready-to-run update kit; and produce audit-ready evidence — every step grounded only in the regulator’s own words, never invented.

Source of record: https://claudeforcompliance.com/regs/va-m26-7-ch12-t34/ · register va-m26-7-ch12-t34 · Claude for Compliance. Free to read and download; see regulatory updates and methodology.