VA Lenders Handbook (VA Pamphlet 26-7), Chapter 13, Topic 11 — New Construction
VA Lenders Handbook (VA Pamphlet 26-7), Chapter 13, Topic 11 — New Construction.
Verbatim regulatory text
Verbatim provisions from VA Lenders Handbook (VA Pamphlet 26-7), Chapter 13, Topic 11 — New Construction — each quote is a verified substring of the regulator-published source snapshot, not retyped. Quoted for reference; this is not legal advice. The operational layer (P&P updates, prompts) lives in the regulation update kits.
VA Lenders Handbook (VA Pamphlet 26-7), Chapter 13, Topic 11 — New Construction
11. New Construction Inspections/Warranty For new construction properties, either 11a or 11b must be required based on whether or not local building inspections are performed. Since new construction must have either a 1 year or a 10-year warranty, either 11c or 11d must be marked.
Operationalizing VA Lenders Handbook (VA Pamphlet 26-7), Chapter 13, Topic 11 — New Construction
This is verbatim, source-snapshotted regulator text from the Claude for Compliance open corpus. To turn a rule like this into compliance work product: gap-analyze your policies and procedures (P&Ps) against these requirements to surface stale, conflicting, or missing provisions; operationalize any change with a ready-to-run update kit; and produce audit-ready evidence — every step grounded only in the regulator’s own words, never invented.
Source of record: https://claudeforcompliance.com/regs/va-m26-7-ch13-t11/
· register va-m26-7-ch13-t11 · Claude for Compliance. Free to read and download;
see regulatory updates and methodology.